PCB Terminal Progressive Stamping: Drawing, Plating and Inspection RFQ Guide
Specify 0.5 mm phosphor-bronze PCB terminals, plating zones, progressive-die features, inspection evidence and quotation inputs.
2026-10-08
Control outsourced heat treatment for CNC parts with defined process order, lot traceability, hardness evidence, dimensional reinspection and RFQ release rules.
Review Zhengna Technology PCB standoffs in tape-and-reel packing, workshop equipment, visible inspection checks, claim limits and buyer RFQ inputs.
Plan injection-molded first-article approval with cavity mapping, measurement conditions, appearance limits, reaction rules, lot release and RFQ evidence.
Plan CNC series-production release with drawing control, route approval, tool-wear reactions, lot traceability, inspection evidence and RFQ inputs.
Specify CNC part datums, inspection methods, 100% versus sampling rules, traceable reports, and RFQ evidence using a bounded production case.
Control aluminum stamped-part springback, galling, burrs, surfaces, dimensions, inspection evidence, and RFQ inputs before tooling release.
Specify PP molded parts with resin grade, shrinkage direction, warpage controls, datums, measurement timing, inspection evidence, and RFQ inputs.
Specify plating for stamped parts with coating zones, masking, after-plating dimensions, hydrogen-risk controls, inspection, and RFQ evidence.
Build a custom assembly RFQ around the released BOM, controlled work instructions, first-article evidence, rework approval, and lot-release records.